Property Compliance

Book a Free Design Review

We’ll review your SAP at no cost to show you how we can improve your score, reduce build costs, and ensure accuracy.

Book a Free Design Review

We’ll review your SAP at no cost to show you how we can improve your score, reduce build costs, and ensure accuracy.

Air Pressure / Air Permeability Testing (Part L)

Verify building airtightness to meet Part L standards and secure Building Control approval.

Air Pressure / Air Permeability Testing (Part L)

Verify building airtightness to meet Part L standards and secure Building Control approval.

What is it?

Tests the airtightness of a building to ensure minimal heat loss and compliance with Part L.

Why It Matters?

Improper airtightness can fail compliance and increase running costs.

What standards do we adhere to?

ATTMA TSL1/TSL2, Approved Document L.

Our Process

On-site test with calibrated equipment

Identify and advise on leakage
points

Retest if
required

Issue test
certificate

Compliance Bundles

Tailored packages to simplify your safety responsibilities and save you time.

As Designed Bundle 

Ideal for planning and design stage

Book an As Designed bundle and get priority scheduling for your As Built stage testing.

As Built Bundle

Ideal for completion and sign-off

Book an As Designed + As Built package together and save 10% on total compliance costs.

Ready to Book?

Call us on or book online

Frequently Asked Questions

Many reports and test results can be turned around within 48 hours.

Yes — we regularly collaborate with architects, MEP consultants, and contractors to ensure smooth compliance.

Yes — we operate across the UK.

Yes — bundling services saves both time and money, and we’ll coordinate testing for maximum efficiency.

Scroll to Top